How to decorate the room? Interior decoration process

Architectural decoration is an important means to decorate the rough house purchased by our general public into an artistically beautiful living space that meets our requirements. It can be said that the level of architectural decoration water directly affects the quality and taste of a house because Architectural decoration is a means of designing and processing the exterior of our building based on aesthetics, so the decoration process It has become a core component of architectural decoration. So what are the renovation process? The following decoration home network Xiaobian to explain for you one by one.


装修工艺流程



Decoration process One: the work that needs to be done before the start of construction


1. Whether the floor of the wall is empty or not, if the empty drum requires the developer to remove the redo;


2, kitchen, bathroom, balcony, terrace to do water closure experiments, such as water leakage to urge developers to rectify;


3. Connect the hot and cold water pipes, open the main valve and open the plugs one by one to see if the water is flowing;


4. Protect all finished products (such as security doors, videophone doorbells, finished kitchen and bathroom, gas meters, etc.);


5. Check carefully whether the strong and weak circuits are unobstructed, whether the floor drain or the water is fluent;


6, carefully check whether the wall beam is skewed and so on.


Decoration process Second: transformation of the wall-making process


1. First use the cutting machine to cut the part to be removed and then hit it. Do not use the sledgehammer to avoid the vibration affecting the wall that is not removed;


2, first use a small hammer drill to hollow the bottom and then slowly play up. The door of the new door is to be added to the door;


3, can not hit part: load-bearing walls, concrete walls.


Decoration process Three: water production process


1. The hot and cold water pipes are buried in the depth of the wall. The distance between the pipe wall and the wall skin must be 1cm, strictly following the principle of left heat and right cold;


2. The water outlet shall be arranged in strict accordance with the national standard faucet spacing, and the inner and outer wires shall be separated;


3, no blockage inside, connect the hot and cold water pipe test pump pressure above 0.8mpa without explosion, dripping, dripping, leakage. Do not seal the wall without pressure test;


4, after the tile is laid, the hot and cold water inside the wire elbow can not highlight the brick surface;


5. After the water pressure test, open the main valve and open the plug one by one to see if the joint is blocked.


6. Draw a precise water pipe map and pay it to the owner (it is best to save the photos in the construction section).


Decoration process Four: electric production process


1. The air conditioner of the cabinet machine takes 4 squares of separate circuit. The kitchen and the bathroom are each separated by a 4 square circuit. The lighting is a 2.5 square circuit. The ordinary socket is 1-2 2.5 square circuits. The 1.5 square wire is not used.


2, the separation interval of strong and weak electricity is more than 30cm, the distance between the strong electric pipe and the heating pipe (sheet), hot water pipe, gas pipe is greater than 30cm;


3, the same room power, telephone, TV and other sockets should be at the same level (except in special circumstances), strictly follow the principle of the left zero right fire ground line, the ground line is best to use the yellow-green line specified by the national standard;


4, enter the box line tube with lock protection, the line box should be laid flat, no elbow, the bend should be hot-bent or reed, the pipe should be welded with pvc glue. Strictly follow the principle of threading after first pipe laying, the place where the top can not be buried is to be protected by square wax pipe, bare wire is prohibited, and the ceiling wire must be fixed;


5, weak electricity can not have a connector (TV cable to use a frequency divider), the network cable is strictly prohibited joints;


6. The tube must be protected by electric power. When the three sets of lines enter the same line box, a separate line box must be set up. Place a box at the ceiling where there is a light.


7. When the circuit project is completed, it is necessary to test all the sockets and lamp wires with electric bulbs. If the power is strong or weak, it must be carefully tested and pulled. Is it a live line? It is strictly forbidden to carry out the next process without testing;


8. After the acceptance, draw the accurate road map and pay it to the owner (it is best to take the photo to save).


Decoration process Five: waterproof and moisture-proof production process


1. Clean the wall where the floor needs to be waterproofed;


2, the ground is closely painted with waterproof coating twice, and the place where the down pipe is to be rolled up 20cm;


3. After two days of drying, the water pipe and the floor drain are tightly sealed, and the water of 5-8 cm depth is placed for 48 hours of water shut-off experiment to ensure that there is no leakage in the upper and lower floors, and the floor tiles can be laid. Brick;}


4, the wall brush moisture-proof coating once again, the height is preferably 1.5-1.8m or more, the brushing should be strict;


5, door and window covers and wood products against the wall for moisture-proof treatment, to prevent mildew and blackening in the future, the tanning process is evenly painted on the board against the wall and the ground;


装修工艺流程


Decoration process Six: woodworking production process (prerequisite)


The original door frame should be dismantled and re-made as a door cover. The broken wall body should be made of wood products after the wall powder is flat and dry. Before the door and window cover is installed, the original wall surface of the door and window cover should be strictly protected from moisture to avoid wood products. The paint peels off due to moisture and mildew.


Decoration process Seven: door and window cover production process


1. The woodworker uses the impact hammer to set the board and the solid wood line to fix the eye. The wooden wedge is dried in the sun for one day. After the anti-corrosion treatment, it is nailed into the already-made eye. When the set is made, the board is made of the wall surface. Moisture proof treatment;


2. The high-quality blockboard is nailed to the wall by brushing the tung oil on the wall. The horizontal ruler and the line camel are used to horizontally and vertically, and the inside of the plate is filled as tightly as possible. The blockboard is standing at the side to reach the weight of the door leaf and the nail holding force of the hinge. The door stop is made of a nine-side plate to form a dark side port, and the solid wood small line head;


3, the door cover line with nine PCT plate bottom, the side is solidified with small solid wood lines, solid wood door line and other solid wood lines should be purchased 4-5 days in advance, do not open the bundle on the construction site to dry, and the surrounding air fusion, Nail door and window cover lines should be artificially reserved for more than 1 mm of shrinkage, and must not be closed immediately. Usually (summer) shrink for more than 3 days, (winter) shrink for more than 6 days and then close;


4, the kitchen and bathroom door cover lines should be reserved with the ground 1 cm spacing, in order to avoid ground water;


5. The window table is strictly forbidden to be made of wood. It is recommended to use natural stone, artificial stone, ceramic tile, mosaic and other decorations;


6, the window cover wood production should be made in the natural stone or artificial stone after the installation, in order to achieve a strict seam;


7. Wood products that need to be mixed with oil should be treated with “v” groove in the solid wood line and contact.


Decoration process Eight: door leaf making process


1. Flat-panel craft door production: use two high-quality blockboards to make a solid door. Open the corresponding board with a depth of 3 mm and a spacing of 12 cm. Use wood glue to open the two corresponding grooves. The wood board is pressed together, and the panels are decorated on both sides. The weight is pressed on the flat ground for more than 500 pounds for more than 10 days. During the pressing process, the front and back sides are turned 3-4 times. After 10 days, the door blanks are closed with solid wood lines. After the solid wood lines are closed, they must not be closed immediately. Usually (summer) shrink for more than 3 days, (winter) shrink for more than 6 days and then close;


2, concave and convex process door production: the middle with a high-quality blockboard open (same as above) corresponding groove, 9-12 cm plate on both sides, on both sides of the veneer, placed on a flat ground more than 500 kg weight for 10 days Above, during the pressing process, the front and back sides are turned 3-4 times, and after 10 days, the door blanks are closed with solid wood lines. (dry shrinking process is the same as above);


3, the wardrobe door production process: the middle with 12-15 PCT board, 15 centimeter must open the corresponding groove, the two sides of the veneer, where the cabinet door length of 140 cm or more must be placed on each side of the door with a stainless steel strip, placed On the flat ground, more than 500 kilograms of weight are pressed for more than 10 days. During the pressing process, the front and back sides are turned 3-4 times. After 10 days, the door blanks are closed with solid wood lines. (dry shrinking process is the same as above) the width of the door should not exceed 45 cm;


4, sliding door production process: workmanship and other door leaves are roughly the same, the track should be hidden in the door cover, the glass should be clamped with custom-made solid wood small lines, the ground positioner should be firm, the position should be reasonable.


Decoration process Nine: no door wardrobe production


1. Wood frame frame, back plate 9 PCT plate. If Boeing film is used, the back plate Boeing film will be pasted and then nailed. When the vertical plate and the horizontal plate are attached to the slope sound film, the artificial mouth should be curled. 4 mm, then use a small solid wood line to close the mouth to avoid lifting the edge. Pay attention to the sliding door to prevent the internal drawer from opening when working. (Note: Boeing film, mixed paint, veneer, etc.) can be used for the interior of the wardrobe;


2, the size of the drawer should be strictly in accordance with the size of the sliding door, the upper mouth of the drawer and the headboard should be closed with solid wood small lines (dry shrinking process is the same as above), the pants can not be higher than 1 meter;


3. The distance between the vertical plates should not exceed 1 meter. If it is more than 1 meter, the plate should be added to avoid long time.


Decoration process ten: ceiling production process


1. Use the horizontal pipe to find the horizontal point, and use the ink fountain to bounce the horizontal line along the horizontal point;


2, light steel keel: wooden keel for the side of the dragon, the position of the light trough is made of wood keel or wood board, there is a wood production place to brush fireproof coating, the keel is at least 50, the spacing is 30 centimeters, the spacing of the hanging ribs is 60-80 cm. It is advisable to reserve a gap of 5-8 mm between the gypsum board and the board, and the self-tapping screw of the gypsum board is intrusion 1-2 mm and is treated with anti-embroidery. It is to be flat and firm, and the shape is smooth;


3, wood keel: keel at least 3 * 4 or more, spacing 30 cm is appropriate, hanging rib spacing 60-80 cm is appropriate, hanging ribs are strictly prohibited to use wooden wedge-shaped nails to the top, brush tight fire-resistant paint until the wooden keel color is not visible , the keel is covered with a layer of full-featured Liujiu core and then placed on the gypsum board. The gap between the gypsum board and the board is artificially reserved for 5-8 mm, and the plasterboard surface self-tapping screws are trapped by 1-mm and prevented. Embroidery treatment, to be flat and firm, the shape should be smooth;


4, aluminum gusset plate: strict requirements of the level of operation, elastic horizontal line, light steel keel card mouth to be aligned, keel spacing within 50, hanging rib spacing 60-80 cm should be appropriate, the hand should be light on the board, so as not to press the board surface When the pit comes, the contact between the edge strip and the tile is not tight, and the sealant should be used to make it tight;


5, aluminum composite panel: wooden keel at least 3 * 4 or more, spacing 30 centimeters is appropriate, hanging rib spacing 60-80 cm is appropriate, brush tight fireproof coating, keel on a layer of full feet Liu Yan core nine PCT board and then The aluminum-plastic composite board is pasted with the universal adhesive. The gap between the aluminum-plastic composite panel and the board should be artificially reserved for 3-4 mm. It has been filled with other colors to achieve the effect of dividing the grid. To be flat and firm, the shaped shape should be smooth. The corners of the folded surface should be smooth and unbreakable or brown.


The above is a detailed answer to the decoration process, I do not know if you are satisfied with the introduction of the decoration home network Xiaobian. If you want to know more about the exciting content, please continue to pay attention to our decoration encyclopedia!



More related wonderful reading:

Floor heating construction process electric heating floor heating construction process

Home improvement construction process construction process acceptance criteria and precautions

Exterior wall coating construction process exterior wall coating construction process

Diatom mud background wall raw material diatom mud background wall process

What is the decoration process? Detailed process of decoration process

It can be used in all bio-inner filters, outer filters, drop purification filtration systems and garden pond filters.
It is also particularly suitable for small biofilters as a highly effective and durable filter material. Biofilter cotton is used as a pre-filter material to avoid contamination caused by floating objects.
Since the ceramic ring is covered with micropores, it is suitable for the proliferation of nitrifying bacteria, which can play a role in purifying water quality.
Features:
It can be used efficiently in small filters.
The effect is fast - whether it is fresh water or seawater aquarium, the best water quality.
Keep fish and plants healthy.
Reduce the frequency of water changes.
Long service life.
It does not decompose itself and is resistant to seawater corrosion.
Can be used in most filters.
The unique pore structure makes the nitrifying bacteria live and work in peace.
Hail Reminder: The ceramic ring is divided into a large ring and a small magnetic ring. It is necessary to choose the size according to different containers, and the price is cheap.

Alumina Ceramic Ring

Alumina Ceramic Ring,Alumina Textile Ceramic Ring,Alumina Ceramic Raschig Ring,Alumina Ceramic Seal Rings

SHENZHEN HARD PRECISION CERAMIC CO.,LTD , https://www.hardcm.com