Floor spring installation construction method

Detailed construction method of ground spring slotting:

The first step is to determine the position of the slot: first take out the main body of the ground spring and place it in a predetermined installation position. At this time, take a vertical line and place a vertical line from the center of the top shaft of the ground spring, and then move it. The position of the spring is such that the center of the plumb bob is placed at the center mark of the flat shaft of the floor spring, and at the same time pay attention to the horizontality of the spring, the verticality of the four directions of the front, rear, left and right, and then trace the contour of the spring body.

The second step, the implementation of the slot: the edge of the already described ground spring contour area is cut with an angle grinder to a notch of about 3-5MM, and then the electric hammer or the hand chisel is used to excavate the inner contour area of ​​the spring. Ground material, which can be used repeatedly with angle grinder, electric hammer and chisel, chisel in detail, electric hammer for larger material, angle grinder in side line, and depth of ground spring groove, close to thickness The ground spring body can be placed in the ground slot to see if it can stay below the ground.

The third step, the solid spring body: when the ground spring body can be completely placed in the ground groove, the grounding spring body can be stabilized. Now the ground spring is stable and the mounting material is mostly used by the quick-drying powder, but can also be used. Cement, but cement solidifies for a longer period of time. Remove the ground spring body, add an appropriate amount of quick-drying powder in the ground tank, stir the water until the viscosity is appropriate, and then put it into the ground spring body. Use a rubber hammer or a wooden block to hit the ground spring with a hammer to make the floor spring You can restore the surface level to the surrounding ground, then take the plumb line to find the spring axis position and fine-tune the spring body.

After the above three steps, the ground spring body slotting process is perfectly completed, but only a few points must be noted:

(1) The size of the groove is moderate, not too big or too small, too large to affect the appearance, too small, the stability of the material is small, the fixation is not strong.

(2) The position of the ground spring axis must be accurate. You must use plumb lines or other tools for finding vertical lines.

(3) The solid cement or quick-drying powder has a suitable viscosity to ensure the strength of the spring.

(4) After the slot is stabilized, the spring or the quick-drying powder must be installed until the cement or quick-drying powder has sufficient strength to prevent the ground spring from shifting and causing rework.

Art Blade

Art Blade,Runner Art Blade,Utility Knife,Utility Blade

Chunlei Quntification Co.,Ltd , https://www.hychunleitools.com