Operational Standards for Paint Construction in the Meiyu Season

Brand shop: Oulong paint master paint

Metsy paint construction operating standards

1. Must be done before the paint to do mouth protection (such as marble, floor tiles, window board, kitchen equipment, etc.).

2. Before plastering, inspect the original wall surface brush layer for cracks and empty shells. This phenomenon must be removed and repainted (large-scale empty shell walls must be reported to the owner for consultation).

3. Screw eyes are made of putty scraper after anti-rust treatment, and the seam is tightly attached with a thick bandage.

4. Plastering the wall can not be less than 3 times, 3 to 4 times oil emulsion paint (including closed primer again).

5. Latex paint wall construction should be done with smooth walls, vertical corners, and beam angles.

6. After applying the wall plaster to the wallpaper, first apply the damp-proof paint once again. The wallpaper must have a relative texture. The seams must be tight, and the yin and yang angles should not cause drums.

7. The color of the putty of the nail should be basically the same as that of the veneer, and the putty of the nail can't invade.

8. The veneer oil primer is 6 times (including the first pass sealer), and the oil finish is polished and waxed after 1 pass (drawings and budget have special requirements according to drawings and budget).

9. Both the upper part of the door string and the lower part of the window sill must be painted.

10. If there is no veneer veneer inside the cabinet, it must be varnished twice.

Links: This site friend wall paint construction record

Three trees Paint Paint Lacquer Paint Window Marble Coating Kitchen Equipment Kitchen Cabinet Door

Expanded Steel Diamond Mesh

Shunxing Hardware Wire Mesh Co., Ltd. , http://www.rywiremesh.com