How to avoid home improvement disputes
First, attach importance to the contract. Since many problems are in the contract, it is recommended that both sides of the contract must clarify the contents of the contract before signing the contract. Each article will not fall flat. The decoration company is responsible for telling customers what each contract term means. Consumers should not sign their names easily, regardless of the size of the contract, before they fully understand the contract. If the annex to the contract (drawings, quotation, material procurement plan, construction plan) is not completely prepared, do not sign it.
Second, the green environmental protection requirements in the design program. The decoration association of the province often encounters consumers who are required to inspect the indoor air environment after home improvement. Before that, they did not have this requirement. In fact, even if the content of harmful gases is exceeded at this time, it is difficult to find a solution. Therefore, we must "prevention-based, testing supplemented." Put your own requirements for environmental protection in the contract and put it in the design plan.
Third, strictly perform the contract until the end of the contract. Even if there are some changes to the contract itself, it must be discussed with the other party to the contract. He himself should also ask the other party to strictly perform the contract. This is a responsible attitude towards his own legal rights and the other party’s legal rights. The problem is also guaranteed for himself.
It should be reminded that when the owner signs a contract with the construction unit, it is necessary to sign the liability for breach of contract and related liability. It is best to determine the specific amount of liquidated damages per day. If it is based on the ratio of the total project price, it is best to measure the amount of the specific amount equivalent to each day. If the amount of liquidated damages is too small, it may not achieve the effect of restraint.
In addition, different construction projects have different warranty periods. According to the regulations, the warranty period for bathroom walls, floors, and waterproof requirements and anti-leakage projects shall not be less than 5 years. The warranty period for electrical pipelines, water supply and drainage pipelines, equipment installation and renovation projects shall not be less than 2 years. The warranty period for wooden floors and cabinets must not be less than 1 year. Other construction projects should be carried out according to the warranty period agreed by both parties.
During the warranty period, the maintenance issues after the quality problems occurred in the project are also the focus of the home improvement complaints. Home improvement companies think that as long as they are repaired to ensure normal use of it, and some owners believe that they should compensate for economic losses. In this regard, it should be stipulated in the home-installed contract so that when problems arise, they can follow the regulations.
Renovation Start-up Preparation of New House Renovation Precautions Renovation Precautions Home Renovation Design Interior Decoration Company Decoration Bathroom Design Bathroom Waterproofing
Characteristics and Advantages
(1) Intelligent control design: adjustable main parameter and secondary parameter automatically according to the weight of door leaves;
(2) Low noise: Special static sound track, integration of motor, worm-gear and retarder.
(3) Anti-clamping function: automatically reverse when meeting barriers;
(4) Unique electronic motor lock: the motor will lock up when the door is forced to open.(controlled by remote or switch)
(5) Tighten force: seal door when closed, power consumption approximately 10W under standby;
(6) Advanced brushless motor(36V,100W) can automatically adopt different heavy door leaves;
(7) Bi-doors inter-locking: one of the door leaves always remains closing;
(8)Safety sensor terminal: sensor stops working when door closed;
(9)Unique coating technology: never rusty;
(10)Easy and convenient to install;
(11)Working Process: when the door leaf closes to the right place, the door leaf will slightly shift to the door frame and the ground. The rubbers on the four sides of the door leaf will completely combine with door frame and ground, which ensures air tightness. When the door is open, the rubbers will separate from door frame and ground, which avoids contraction on the ground.
Technical Specification
Specification |
Light Duty |
Heavy Duty |
||
Rang of the Door |
Single-Leaf |
Double-Leaf |
Single-Leaf |
Double-Leaf |
Door leaf max weight |
100kg |
100kg x 2 |
200kg |
200kg x 2 |
Mounting Method |
Surface mounting or built-in mounting |
|||
Open Width |
700-2000mm |
650-2000mm |
750-2000mm |
650-2000mm |
Power Supply |
AC 220v ± 10%, 50-60 Hz |
|||
Opening Speed |
300-500mm/s (adjustable) |
|||
Closing Speed |
250-550mm/s (adjustable) |
|||
Creep speed |
30-100mm/s (adjustable) |
|||
Hold-open time |
0.5-20s (adjustable) |
|||
Airproof Force (Max.) |
>70N |
|||
Manual Pushing Force |
<100N |
|||
Electronic Lock Force |
>800N |
|||
Power consumption |
150W |
|||
Ambient temperature |
-20+50 C |
Technical Details:
(1) Rubber lining sealing technology combined with V groove on the guide rail enables the door completely sealed when the door closed;
(2)Special door body location technology. Semicircular surface beam on the ground matches with the V style groove at the bottom of door leaf, which stop the door from swing and make sure it moves stable and smooth;
(3) The door body decorated with matte stainless steel or spray surface, and on the middle and both sides with sealing stripes to ensure the hermetic effect.
(4)Feet sensor switch applied to avoid contagion;
Stainless Steel Sliding Door,Stainless Steel Bypass Sliding Door,Stainless Steel Interior Sliding Door,Stainless Steel Folding Sliding Door
Shenzhen Hongfa Automatic Door Co., Ltd. , https://www.hffastdoor.com